Holiday Home - Atlas Highland

Holiday Home - Atlas Highland

Photograph Album of Atlas Highland


21st July 2014
This week spent time refurbishing the chassis

Chassis refurbished
1st to 4th August 2014
This week the decking was fitted to Holiday Home

Outside lights fitted
Decking and Outside lights fitted

Decking  and  Outside lights fitted
Decking and Outside lights fitted
Decking and Outside light fitted.
New Patio set so now time to relax...
Patio set.

September 2014:
Now have covered in steps so Pippa does not slip through, also placed Plum gravel under the decking,
Photograph album of Steps and Gravel
.
Steps and under decking gravel
My Nephew Simon Cowley has put some of his Teapot Collection around my Holiday Home, So it now becomes “Teapot Lodge” Photograph Album
Teapot Lodge
Teapot Lodge


9th August 2015
Just added a finishing touch by fitting a front and side skirt to Holiday Home.
Photograph Album of fitting front Skirt
Front Skirt fitted to Holiday Home
Front Skirt and side fitted to Holiday Home



24th June 2016. 
Updated the flooring in Holiday Home by taking up old carpet and replacing it with heat retaining underlay and laying Laminate flooring in my Holiday Home. Kitchen, Hallway, Dining, Living room and Bedrooms have Oak laminate flooring.
Oak laminate flooring in living room.
Oak laminate flooring in living room.
Toilet and Family Shower room have black slate laminate flooring.
Toilet and Family Shower room have black slate laminate flooring.
Toilet and Family Shower room have black slate laminate flooring.

October 2016

Solar Lights fitted to decking
Solar Lights fitted to decking.
December 2016
Finally get a storage box for Holiday Home.
Storage Box
21st September 2017
Due to the increase in pitch fees and the site going down hill : grass not getting cut, time limit on being introduced on the out door swimming pool, Entertainment being cut down. I sell  the holiday home!


No comments:

Post a Comment